Brcko, Water Treatment Plant, Bosnia and Herzegovina
Client:Government of Brcko District
Location:Bosnia and Herzegovina
Start-up:2009
Capacity:30,000 m3/d

Description:

  • WABAG as general contractor was reponsible for the planning, supply, installation and commissioning of the new treatment plant for the production of 30,000 m3/d of drinking water from the River Save.
  • Raw water: surface water
  • Product: drinking water
  • The plant design consists of a combination of various process phases – a multi-barrier system – which easily secures adherence to international drinking water standards.

Main plant components:

  • Raw water pumping station
  • Pre-oxidation
  • Sedimentation
  • Two-layer filtration
  • Main oxidation
  • Biological activated carbon filter
  • Disinfection
  • Sludge treatment
Brcko100
Brcko101
Brcko102